1. Add MHs (Manhole)
2. Add MH Between MHs
3. Read Graund Elevations for MHs
4. Add Pipes
5. Add Catchment Area
6. Error Checking
7. Design
8. Finalize the Project to Plot
Renumber the MHnos (MH numbers)
Add Water Drop Head
Prepare Calculation Tables
Prepare General Layout Plan (1/5000)
Prepare Profiles
9. Port the Network to the Google Earth